The Crew.jpg
Viewed: 16 times.
|
Pastor Aguire leveling the septic floor.jpg
Viewed: 17 times.
|
Chester installing forms with James supervising.jpg
Viewed: 19 times.
|
James moving the saw.jpg
Viewed: 13 times.
|
More work on the forms.jpg
Viewed: 15 times.
|
Forms in place for septic.jpg
Viewed: 19 times.
|
Pastor Aguire from San Juan helped with the cement.jpg
Viewed: 21 times.
|
Esidro and Johnny helped load the mixer.jpg
Viewed: 29 times.
|
Harold moving the cement.jpg
Viewed: 24 times.
|